Section 25-2-4.1. Safety Fire Commissioner -- Fees and charges  


Latest version.
  •    (a) The Commissioner is authorized to assess and collect, and persons so assessed shall pay in advance to the Commissioner, fees and charges under this chapter as follows:
          (1) New anhydrous ammonia permit for storage in bulk (more than 2,000 
                   gallons aggregate capacity) for sale or distribution one-time 
                   fee.....................................................$ 150.00
          (2) Annual license for manufacture of explosives other than fireworks...
    .........................................................................150.00
          (3) Annual license for manufacture, storage, or transport of fireworks...
    .......................................................................1,500.00
          (4) Carnival license...............................................150.00
          (5) Certificate of occupancy.......................................100.00
          (6) Construction plan review:
             (A) Bulk storage construction...................................150.00
             (B) Building construction, 10,000 square feet or less...........150.00
             (C) Building  construction, more than 10,000 square
                      feet................................................... .015
     
                                                                    per square foot
             (D) Other construction..........................................150.00
          (7) Fire sprinkler contractor certificate of competency............150.00
          (8) Liquefied petroleum gas storage license:
             (A) 2,000 gallons or less......................................150.00
             (B) More than 2,000 gallons.....................................600.00
          (9) Building construction inspection:
             (A) 80 percent completion, 100 percent completion, annual, and first 
                      follow-up................................................none
             (B) Second follow-up............................................150.00
             (C) Third and each subsequent follow-up.........................220.00
          (10) Purchase, storage, sale, transport, or use of explosives other than 
                   fireworks:
             (A) 500 pounds or less...........................................75.00
             (B) More than 500 pounds........................................150.00
          (11) New self-service gasoline station permit one-time fee.........150.00
          (12) New permit to dispense compressed natural gas (CNG) for vehicular 
                   fuel one-time fee.........................................150.00

    (b) The licenses and permits for which fees or charges are required pursuant to this Code section shall not be transferable. A new license or permit and fee are required upon change of ownership.
Code 1981, § 25-2-4.1, enacted by Ga. L. 1992, p. 2725, § 4; Ga. L. 1993, p. 448, § 1; Ga. L. 2010, p. 9, § 1-50/HB 1055.